The Billion Pound Boom
Over the past decade, data centres have quietly become one of the most valuable and competitive asset classes in property development. Once considered a niche industrial use, data centres are now at the heart of the global digital economy, powering everything from streaming and AI to banking and logistics. In the UK, demand for data centre development land has surged, driven by hyperscale operators such as Amazon, Microsoft, and Google. Prime plots in established hubs like Slough, West London, and Dublin’s data corridor can now reach towards 10 million per acre. For comparison, that’s more than many central London residential sites.
Reliable Power
The single biggest factor behind data centre costs is power. A modern hyperscale facility can consume as much electricity as a small town, and securing that supply is a major challenge. In many regions, grid capacity is already stretched, and obtaining a new high-voltage connection can take up to 10 years. As a result, sites that already have power allocation and substation access command huge premiums. In places like Slough, where demand outpaces supply, developers are effectively buying the power, not the land itself. Power infrastructure, connection fees, and backup systems can account for 40–50% of total development costs, making it the defining factor in both land value and project viability.
Cooling
Another major cost driver is cooling. Servers generate enormous heat, and efficient thermal management is essential to maintain uptime. Traditional air-cooled systems are energy-intensive, while new liquid-cooling and hybrid solutions require complex engineering and installation. Cooling infrastructure isn’t just expensive, it also consumes land. Developers must design for air circulation, cooling towers, and sometimes water treatment facilities. This makes site selection and layout critical, further driving up the cost of suitable development land.

Planning Challenges
Planning permission for data centres remains one of the biggest challenges in the development process. Despite strong demand, many local authorities still categorise data centres as industrial developments, leading to additional scrutiny and longer determination times. Concerns over energy consumption, visual impact, and sustainability often result in complex negotiations with planning officers. As a result, securing consent requires a well-prepared planning strategy, detailed environmental assessments, and early engagement with the local authority. These are areas where an experienced property development consultancy can add significant value.
Conclusion: Powering the Future of Property Development
Data centres are expensive because they sit at the intersection of property development, technology, and infrastructure. They require immense power, advanced cooling and specialist planning expertise – all of which come at a cost. For developers, investors, and landowners, understanding these factors is key to unlocking opportunities in this rapidly growing sector. At Moss & Partners, our development land agency works closely with operators and infrastructure providers to identify, appraise, and deliver sites with genuine data centre potential, helping clients navigate one of the most dynamic and high-value markets in modern property development. We have solutions to solve the complex issues when it comes to data centre developments.